Description
RENAULT CLIO NEW DCI, 75, sport tourer
KM display: 214684 km
Last MOT: 07/11-2022 – approved.
Euronorm: Euro V
The vehicle has been started with a booster and driven at the location.
The vehicle has a defective battery – does not accept power.
There are 2 keys for the vehicle.
The vehicle has air conditioning.
Lights, lamps and mirrors are without significant visible defects.
There are stone chips in the windshield.
There are stone chips on the hood.
The vehicle has a parking sensor at the rear.
Estimated remaining tire tread: approx. 4 mm
There are 5 seats including the driver's seat.
There is damage to the front bumper.
There are scratches on the rear bumper.
There is mold in the cabin.
There is paint damage on the right front door.
There is a hole in the driver's seat.
See photos and specifications for further info.
The vehicle has not been fully functional tested.
The vehicle has natural wear to be expected in relation to age.
The vehicle cannot be inspected.
The buyer must provide loading and removal of the vehicle.
The vehicle MUST be picked up within 30 days of the auction end.
Sold without licenseplate.
B2B Auctions A/S handle the sale of this vehicle on behalf of the owner.
ATTENTION: As auction equipment in some cases is picked up long after it has been inspected, the functionality of batteries, brakes that get stuck, electrical faults and similar, and faults directly due the fact the vehicle is not being used, can therefore not be guaranteed.
| B2B number | 66164 DN45734 |
| Reg. Nr.: |
DN45734
|
| Chassis number: |
VF17R040H50611420
|
| Brand: |
RENAULT
|
| Model: |
Ny Clio
|
| Type: |
dCi 75 Sport Tourer
|
| First registration: |
2014-05-07
|
| Last MOT: |
2022-11-07
|
| Is the Danish registration fee on this vehicle paid?: |
Yes
|
| VAT is to be added when sold in DK: |
Yes
|
| Propellant: |
Diesel
|
| Total weight (Kg): |
1703
|
| Started: |
Yes
|
| Towing hitch: |
No
|
| Cabinet condition: |
Has holes
|
| General overall assessment: |
C: The vehicle may have major faults, defects or possibly construction changes.
|