Description
PMV Trailers 1700
Trailer with rigging 1700 BRS
Release document: Yes
Length: approx. 650 cm.
Width: approx. 175 cm.
Height: approx. 265 cm.
Loading height: approx. 75 cm.
Loading length inside: approx. 320 cm.
Loading width inside: approx. 170 cm.
Weight, approx.: 400
Load, approx.: 900
Estimated remaining tire tread front: 6
Estimated remaining tire tread rear: 6
Tyre size 1 axle: 185 x 14
Tyre size 2 axle: 185 x 14
Overrun brakes: Yes
Plywood floor: Yes
Sides can be folded down: Yes, except for the front end, which is fixed.
Towing eye Ø52
Lights have not been checked.
Trailer was functionally tested: No
Shows rust and signs of use.
Aluminum side panels.
Light socket missing.
Trailer has been towed to the location.
Height-adjustable drawbar.
Overrun brake defective (handle and cable).
Towing eye bent.
Shelving/shelf system on the bed.
Several defects/holes on tarpaulin, see photo.
The trailer has not been fully functional tested.
Condition unknown.
The trailer has scratches.
The trailer has natural wear to be expected in relation to hours and age.
See pictures and the *specifications* tab for more information's.
The trailer cannot be inspected before bidding.
The buyer will be responsible for start-up, loading and removal of the trailer.
Sold without license plates.
The trailer is sold with a release certificate from The Danish Ministry of Defense Acquisition and Logistics Organization.
At pick up the buyer can NOT expect assistance for loading and lashing of trailer.
The trailer MUST be picked up within 30 days of auction end
NOTE: For purchases from another EU country, the cost of mandatory export documentation fees will be added.
B2B Auctions A/S handle the sale of this trailer on behalf of the owner.
| B2B number | 77651 12001 |
| Reg. Nr.: |
12001
|
| Chassis number: |
9707
|
| Brand: |
PMV Trailers 1700
|
| Model: |
Påhængsvogn/Trailer med rigning 1700 BRS
|
| VAT is to be added when sold in DK: |
Yes
|
| General overall assessment: |
C: The equipment can have major faults, defects or possibly construction changes.
|